Conventional Island

This group of contracts encompasses the power generation plant to be located in buildings constructed by the Main Civils contractor.

Main Turbine Generators

This large contract covers the design, manufacture, erection and commissioning of the turbine, generator, feed water plant and auxiliary systems on both units. The Contractor is General Electric who provided the turbine systems at Flamanville 3 and many nuclear power plants around the world.

Power Transmission

This contract covers the design, manufacture, erection and commissioning of the power transmission on both units. The preferred bidder is ABB.

Large Capacity Travelling Cranes

This contract covers the supply of all cranes within the Turbine Hall and the Pump Building. This ranges from the very large 300 tonne travelling cranes needed to assemble the main turbines to smaller cranes needed during normal operation. The contract includes for the design, manufacture, transportation, installation and commissioning of the 29 cranes required.

Inspection of Condenser Tubes

The contract covers the equipment used for the periodic inspection of the main turbine condenser tubes.

Non-Classified HVAC

The scope of this contract is the provision of the Heating, Ventilation and Air Conditioning systems within the conventional parts of the plant inclusive of turbine halls and offices, electrical buildings, water treatment buildings and a variety of corridors, galleries and stairwells.

Demineralization and degassing processes

The scope of this contract is to provide primary and secondary EPR circuits with demineralised water at pH 7 and pH 9.

By clicking on the link below you will be directed to an interactive table, within the EDF Energy website,  which shows all of the current work packages required to build Hinkley Point C together with a brief description of scope, procurement status, value band and Tier 1 supplier details where applicable.